Interview Questions for Civil Engineering (Part-01)

 

Interview Questions for Civil Engineering (Part-01)



  1. What are the steps involved in Building Construction?
    Ans: Concreting, Masonry work, Plastering work, Flooring work, Formwork, Steel cutting & bending.
  2. How do you measure the volume of concrete?
    Ans: Length × Width × Thickness.
  3. Why Concrete Cover is provided for reinforcement?
    Ans: To protect from corrosion and fire.
  4. How to check level on construction site?
    Ans: Spirit level, Dumpy level, Leveling pipe.
  5. Accuracy of dumpy level?
    Ans: 5 mm.
  6. Weight of 12m long 10mm steel?
    Ans: 7.2 kg.
  7. Formula for unit weight of steel?
    Ans: (D² / 162)
  8. Size of concrete cube?
    Ans: 15×15×15 cm.
  9. If cube fails at 28 days?
    Ans: Conduct core cutter test.
  10. Mix ratio of M20?
    Ans: 1:1.5:3
  11. Unit weight of 12mm steel?
    Ans: 0.89 kg/m
  12. Density of steel?
    Ans: 7850 kg/m³
  13. Fe-415 indicates?
    Ans: Tensile strength.
  14. Volume of 50kg cement bag?
    Ans: 0.035 m³
  15. Stair width (residential)?
    Ans: 900 mm
  16. Max stair slope?
    Ans: 40°
  17. Min column steel diameter?
    Ans: 12 mm
  18. Standard brick size?
    Ans: 19×9×9 cm
  19. Unit weight of RCC?
    Ans: 2500 kg/m³
  20. 1 Acre = ?
    Ans: 43560 sq ft
  1. UTM full form → Universal Testing Machine
  2. Cement expiry → 3 months
  3. 1 sq meter → 10.76 sq ft
  4. Unit weight of 25mm steel → 3.85 kg/m
  5. 1 hectare → 2.47 acres
  6. 1 gallon → 3.78 liters
  7. 1 kN → 101.97 kg
  8. 1 tonne → 1000 kg
  9. Max free fall of concrete → 1.5 m
  10. Level instrument → Dumpy level
  11. Min bars in circular column → 6
  12. AAC → Autoclaved Aerated Concrete
  13. NDT → Non-Destructive Test
  14. JCB → Joseph Cyril Bamford
  15. Soil bearing test → Plate load test
  16. Ring & ball test → Bitumen
  17. Min hook length → 75 mm
  18. Extra length bent bar → 0.45
  19. Dumpy least count → 5 mm
  20. EGL → Existing Ground Level
  21. Brick water absorption → 20%
  22. Bricks in 1 m³ → 500
  23. Cement consistency → 25%
  24. Expansion test → Soundness
  25. Concrete strength time → 28 days
  26. Cement volume → 0.035 m³
  27. Min RCC grade → M20
  28. Cement expiry → 3 months
  29. DPR → Detailed Project Report
  30. Setting time → Initial <30 min, Final 600 min
  1. Construction manager duties: Supervision, cost estimation, material purchase, proposals, scheduling.
  2. Construction risks: Falls, scaffold failure, electric shock, motion injuries.
  3. Hybrid foundation: Combination of mat + piles.
  4. Demolition methods: Hydro, dismantling, pressure bursting.
  5. Floating slab: Hollow mat foundation.
  6. Flashing: Water protection joint.
  7. Roof types: Slate, wood, metal.
  8. Construction inspections: Site, foundation, framing, insulation, final.
  9. Post-construction inspection: Drainage, safety, buildings.
  10. Alternate bid: Adjustment to base bid.
  11. Change order: Contract modification.
  12. Construction cost includes: Material, labor, equipment, profit.
  13. CPM: Project scheduling method.
  14. Demising wall: Boundary wall.
  15. Progress payment: Payment in stages.
  16. Structural frame: Beam + column system.
  17. Release of lien: Legal release document.
  18. Architect contract: Legal agreement.
  19. 1/8 scale: 1/8 inch = 1 foot.
  20. Architect software: AutoCAD, 3DS Max, SketchUp, etc.
  21. Architect skills: Design, software, engineering, business.
  22. Pre-project factors: Permissions, materials, environment.
  23. CAD tools: Dimensions tools.
  24. Engineering apps: Sketchbook, AutoCAD WS, Dropbox.
  25. Wood shingles: Roofing material.
  26. Architect problems: Budget, space, unclear client needs.
  27. Roof height: 1–2 stories.
  28. Roof types: Mansard, gambrel, etc.
  29. Cantilever issues: Deflection, damage, instability.
  30. Built-in balcony: Supported structure.
  1. Built vs super built-up → extra amenities included
  2. Living room sizes → small to large ranges
  3. M25 → 25 MPa strength
  4. Max concrete temp → 32°C
  5. Grouting → cement-sand repair method
  6. Bitumen for cracks → plastic bitumen
  7. BM & SF → bending & shear forces
  8. Bitumen → plastic
  9. Wall top cover → coping
  10. Earth retaining wall → retaining wall
  11. Curing → 7–10 days
  12. Fine aggregate sample → 300 g
  13. CBR soaking → 96 hrs
  14. Bearing capacity → load capacity of soil
  15. Honeycomb → air voids
  16.             Cement tests → color, smoothness, float
  17.             Cement types → OPC, PPC, etc.
  18.             Water-cement ratio → affects strength
  19.             Concreting steps → batching → curing
  20. Bursting reinforcement → tensile stress
  1.             Railway embankment width → 6.1 m
  2. Engine direction → turntable
  3. Rail stop → buffer stop
  4. Moment of inertia → resistance to rotation
  5. Heel clearance → switch gap
  6. Brick tests → absorption, strength
  7. Flange way clearance → rail gap
  8. Void ratio → void/solid
  9. Stock rails → tongue clearance
  10. Switching angle → rail angle
  11. CPM → project planning
  12. Cement SG → not practical
  13. Switch throw → rail distance
  14. Max throw → 995 mm
  15. Crossing number → 12
  16. Warning signal → outer signal
  17. Building steps → same as Q1
  18. Concrete volume → L×W×H
  19. Concrete cover → protection
  20. Level checking → tools
  21. Dumpy accuracy → 5 mm
  22. Steel weight → 7.2 kg
  23. Steel formula → D²/162
  24. Cube size → 15 cm
  25. Cube fail → core test
  26. M20 ratio → 1:1.5:3
  27. Steel weight → 0.89 kg/m
  28. Floating slab → mat foundation
  29. Steel density → 7850 kg/m³
  30. Fe415 → tensile strength
  31. Curb → separator, height = 100 mm