  1. What are the steps involved in Building Construction?
    Ans: Concreting, Masonry work, Plastering work, Flooring work, Formwork, Steel cutting & bending.
  2. How do you measure the volume of concrete?
    Ans: Length × Width × Thickness.
  3. Why Concrete Cover is provided for reinforcement?
    Ans: To protect from corrosion and fire.
  4. How to check level on construction site?
    Ans: Spirit level, Dumpy level, Leveling pipe.
  5. Accuracy of dumpy level?
    Ans: 5 mm.
  6. Weight of 12m long 10mm steel?
    Ans: 7.2 kg.
  7. Formula for unit weight of steel?
    Ans: (D² / 162)
  8. Size of concrete cube?
    Ans: 15×15×15 cm.
  9. If cube fails at 28 days?
    Ans: Conduct core cutter test.
  10. Mix ratio of M20?
    Ans: 1:1.5:3
  11. Unit weight of 12mm steel?
    Ans: 0.89 kg/m
  12. Density of steel?
    Ans: 7850 kg/m³
  13. Fe-415 indicates?
    Ans: Tensile strength.
  14. Volume of 50kg cement bag?
    Ans: 0.035 m³
  15. Stair width (residential)?
    Ans: 900 mm
  16. Max stair slope?
    Ans: 40°
  17. Min column steel diameter?
    Ans: 12 mm
  18. Standard brick size?
    Ans: 19×9×9 cm
  19. Unit weight of RCC?
    Ans: 2500 kg/m³
  20. 1 Acre = ?
    Ans: 43560 sq ft
  1. UTM full form Universal Testing Machine
  2. Cement expiry 3 months
  3. 1 sq meter 10.76 sq ft
  4. Unit weight of 25mm steel 3.85 kg/m
  5. 1 hectare 2.47 acres
  6. 1 gallon 3.78 liters
  7. 1 kN 101.97 kg
  8. 1 tonne 1000 kg
  9. Max free fall of concrete 1.5 m
  10. Level instrument Dumpy level
  11. Min bars in circular column 6
  12. AAC Autoclaved Aerated Concrete
  13. NDT Non-Destructive Test
  14. JCB Joseph Cyril Bamford
  15. Soil bearing test Plate load test
  16. Ring & ball test Bitumen
  17. Min hook length 75 mm
  18. Extra length bent bar 0.45
  19. Dumpy least count 5 mm
  20. EGL Existing Ground Level
  21. Brick water absorption 20%
  22. Bricks in 1 m³ 500
  23. Cement consistency 25%
  24. Expansion test Soundness
  25. Concrete strength time 28 days
  26. Cement volume 0.035 m³
  27. Min RCC grade M20
  28. Cement expiry 3 months
  29. DPR Detailed Project Report
  30. Setting time Initial <30 min, Final 600 min
  1. Construction manager duties: Supervision, cost estimation, material purchase, proposals, scheduling.
  2. Construction risks: Falls, scaffold failure, electric shock, motion injuries.
  3. Hybrid foundation: Combination of mat + piles.
  4. Demolition methods: Hydro, dismantling, pressure bursting.
  5. Floating slab: Hollow mat foundation.
  6. Flashing: Water protection joint.
  7. Roof types: Slate, wood, metal.
  8. Construction inspections: Site, foundation, framing, insulation, final.
  9. Post-construction inspection: Drainage, safety, buildings.
  10. Alternate bid: Adjustment to base bid.
  11. Change order: Contract modification.
  12. Construction cost includes: Material, labor, equipment, profit.
  13. CPM: Project scheduling method.
  14. Demising wall: Boundary wall.
  15. Progress payment: Payment in stages.
  16. Structural frame: Beam + column system.
  17. Release of lien: Legal release document.
  18. Architect contract: Legal agreement.
  19. 1/8 scale: 1/8 inch = 1 foot.
  20. Architect software: AutoCAD, 3DS Max, SketchUp, etc.
  21. Architect skills: Design, software, engineering, business.
  22. Pre-project factors: Permissions, materials, environment.
  23. CAD tools: Dimensions tools.
  24. Engineering apps: Sketchbook, AutoCAD WS, Dropbox.
  25. Wood shingles: Roofing material.
  26. Architect problems: Budget, space, unclear client needs.
  27. Roof height: 1–2 stories.
  28. Roof types: Mansard, gambrel, etc.
  29. Cantilever issues: Deflection, damage, instability.
  30. Built-in balcony: Supported structure.
  1. Built vs super built-up extra amenities included
  2. Living room sizes small to large ranges
  3. M25 25 MPa strength
  4. Max concrete temp 32°C
  5. Grouting cement-sand repair method
  6. Bitumen for cracks plastic bitumen
  7. BM & SF bending & shear forces
  8. Bitumen plastic
  9. Wall top cover coping
  10. Earth retaining wall retaining wall
  11. Curing 7–10 days
  12. Fine aggregate sample 300 g
  13. CBR soaking 96 hrs
  14. Bearing capacity load capacity of soil
  15. Honeycomb air voids
  16.             Cement tests color, smoothness, float
  17.             Cement types OPC, PPC, etc.
  18.             Water-cement ratio affects strength
  19.             Concreting steps batching curing
  20. Bursting reinforcement tensile stress
  1.             Railway embankment width 6.1 m
  2. Engine direction turntable
  3. Rail stop buffer stop
  4. Moment of inertia resistance to rotation
  5. Heel clearance switch gap
  6. Brick tests absorption, strength
  7. Flange way clearance rail gap
  8. Void ratio void/solid
  9. Stock rails tongue clearance
  10. Switching angle rail angle
  11. CPM project planning
  12. Cement SG not practical
  13. Switch throw rail distance
  14. Max throw 995 mm
  15. Crossing number 12
  16. Warning signal outer signal
  17. Building steps same as Q1
  18. Concrete volume L×W×H
  19. Concrete cover protection
  20. Level checking tools
  21. Dumpy accuracy 5 mm
  22. Steel weight 7.2 kg
  23. Steel formula D²/162
  24. Cube size 15 cm
  25. Cube fail core test
  26. M20 ratio 1:1.5:3
  27. Steel weight 0.89 kg/m
  28. Floating slab mat foundation
  29. Steel density 7850 kg/m³
  30. Fe415 tensile strength
  31. Curb separator, height = 100 mm