Interview Questions for Civil Engineering (Part-01)
- What are the steps involved in Building
Construction?
Ans: Concreting, Masonry work, Plastering work, Flooring work, Formwork, Steel cutting & bending. - How do you measure the volume of concrete?
Ans: Length × Width × Thickness. - Why Concrete Cover is provided for
reinforcement?
Ans: To protect from corrosion and fire. - How to check level on construction site?
Ans: Spirit level, Dumpy level, Leveling pipe. - Accuracy of dumpy level?
Ans: 5 mm. - Weight of 12m long 10mm steel?
Ans: 7.2 kg. - Formula for unit weight of steel?
Ans: (D² / 162) - Size of concrete cube?
Ans: 15×15×15 cm. - If cube fails at 28 days?
Ans: Conduct core cutter test. - Mix ratio of M20?
Ans: 1:1.5:3 - Unit weight of 12mm steel?
Ans: 0.89 kg/m - Density of steel?
Ans: 7850 kg/m³ - Fe-415 indicates?
Ans: Tensile strength. - Volume of 50kg cement bag?
Ans: 0.035 m³ - Stair width (residential)?
Ans: 900 mm - Max stair slope?
Ans: 40° - Min column steel diameter?
Ans: 12 mm - Standard brick size?
Ans: 19×9×9 cm - Unit weight of RCC?
Ans: 2500 kg/m³ - 1 Acre = ?
Ans: 43560 sq ft
- UTM full form →
Universal Testing Machine
- Cement expiry → 3
months
- 1 sq meter → 10.76
sq ft
- Unit weight of 25mm steel → 3.85 kg/m
- 1 hectare → 2.47
acres
- 1 gallon → 3.78 liters
- 1 kN → 101.97 kg
- 1 tonne → 1000 kg
- Max free fall of concrete → 1.5 m
- Level instrument → Dumpy level
- Min bars in circular column → 6
- AAC → Autoclaved Aerated Concrete
- NDT → Non-Destructive Test
- JCB → Joseph Cyril Bamford
- Soil bearing test → Plate load test
- Ring & ball test → Bitumen
- Min hook length → 75 mm
- Extra length bent bar → 0.45
- Dumpy least count → 5 mm
- EGL → Existing Ground Level
- Brick water absorption → 20%
- Bricks in 1 m³ → 500
- Cement consistency → 25%
- Expansion test →
Soundness
- Concrete strength time → 28 days
- Cement volume → 0.035
m³
- Min RCC grade → M20
- Cement expiry → 3
months
- DPR → Detailed Project Report
- Setting time →
Initial <30 min, Final 600 min
- Construction manager duties: Supervision, cost estimation, material
purchase, proposals, scheduling.
- Construction risks: Falls, scaffold failure, electric shock,
motion injuries.
- Hybrid foundation: Combination of mat + piles.
- Demolition methods: Hydro, dismantling, pressure bursting.
- Floating slab: Hollow mat foundation.
- Flashing: Water protection joint.
- Roof types: Slate, wood, metal.
- Construction inspections: Site, foundation, framing, insulation, final.
- Post-construction inspection: Drainage, safety, buildings.
- Alternate bid: Adjustment to base bid.
- Change order: Contract modification.
- Construction cost includes: Material, labor, equipment, profit.
- CPM:
Project scheduling method.
- Demising wall: Boundary wall.
- Progress payment: Payment in stages.
- Structural frame: Beam + column system.
- Release of lien: Legal release document.
- Architect contract: Legal agreement.
- 1/8 scale: 1/8 inch = 1 foot.
- Architect software: AutoCAD, 3DS Max, SketchUp, etc.
- Architect skills: Design, software, engineering, business.
- Pre-project factors: Permissions, materials, environment.
- CAD tools: Dimensions tools.
- Engineering apps: Sketchbook, AutoCAD WS, Dropbox.
- Wood shingles: Roofing material.
- Architect problems: Budget, space, unclear client needs.
- Roof height: 1–2 stories.
- Roof types: Mansard, gambrel, etc.
- Cantilever issues: Deflection, damage, instability.
- Built-in balcony: Supported structure.
- Built vs super built-up → extra amenities included
- Living room sizes → small to large ranges
- M25 → 25 MPa strength
- Max concrete temp → 32°C
- Grouting → cement-sand repair method
- Bitumen for cracks → plastic bitumen
- BM & SF →
bending & shear forces
- Bitumen → plastic
- Wall top cover → coping
- Earth retaining wall → retaining wall
- Curing → 7–10 days
- Fine aggregate sample → 300 g
- CBR soaking → 96 hrs
- Bearing capacity → load capacity of soil
- Honeycomb → air
voids
- Cement tests → color, smoothness, float
- Cement types → OPC, PPC, etc.
- Water-cement ratio → affects strength
- Concreting steps → batching → curing
- Bursting reinforcement → tensile stress
- Railway embankment width → 6.1 m
- Engine direction → turntable
- Rail stop → buffer
stop
- Moment of inertia → resistance to rotation
- Heel clearance → switch
gap
- Brick tests →
absorption, strength
- Flange way clearance → rail gap
- Void ratio →
void/solid
- Stock rails → tongue
clearance
- Switching angle → rail
angle
- CPM → project planning
- Cement SG → not
practical
- Switch throw → rail
distance
- Max throw → 995 mm
- Crossing number → 12
- Warning signal → outer
signal
- Building steps → same
as Q1
- Concrete volume → L×W×H
- Concrete cover →
protection
- Level checking → tools
- Dumpy accuracy → 5 mm
- Steel weight → 7.2 kg
- Steel formula → D²/162
- Cube size → 15 cm
- Cube fail → core
test
- M20 ratio →
1:1.5:3
- Steel weight → 0.89
kg/m
- Floating slab → mat
foundation
- Steel density → 7850
kg/m³
- Fe415 → tensile strength
- Curb → separator, height = 100 mm
0 Comments